Sunday, March 29, 2009

Final Four....months?

Hello, sportsfans! Between a heavy work schedule and March madness, I have not had much to report on the house. But now that the Tarheels have prevailed and there's a whole week before the Final Four, I have time to catch my breath.
On the exterior, Colin and crew have been working on the screened porch...weather permitting. They installed Miratek T&G for the ceiling and Nichiha siding on the house outside of the basement door. And, much to our delight, Steve was able to provide us with our outdoor shower!
From Exterior

From Exterior

The supports for the front porch are complete, made from Azek.
From Exterior

Colin has made a handrail for the stairs out of the same reclaimed barn oak used for the wainscoting. Once Todd applies the finish, it should match.
From Doors, Windows, Trim

All of the interior doors now have levers.
From Doors, Windows, Trim

From Doors, Windows, Trim

Windell and Trampus have installed all of the various knobs and pulls for the drawers and cabinets throughout the house.
From Wood, cabinets, counters

From Wood, cabinets, counters

From Wood, cabinets, counters

In the next week, we hope to have the hardwood floor finishing started, towel bars installed in the baths, a refrigerator and tile for the backsplash delivered, and President Obama's pick for men's NCAA Championship fulfilled.